<sub id="for6y"><s id="for6y"><form id="for6y"></form></s></sub>

    <cite id="for6y"></cite>

        <s id="for6y"></s>
        亚洲一品道一区二区三区,国产无套粉嫩白浆在线,51妺嘿嘿午夜福利,人人妻人人澡人人爽人人精品av,欧美一区二区三区欧美日韩亚洲,欧美一本大道香蕉综合视频 ,884aa四虎影成人精品,国产精品久久久久久福利69堂

        Select your location:

        Location

        KUKA KR QUANTEC welds and assembles door panels at Meiller Aufzugtüren

        Highly flexible robot cell for producing elevator doors


        More than 80,000 door panels leave the plant of Meiller Aufzugtüren in Munich every year – and the trend is rising. What makes this statistic special is that hardly any door panel is identical to another. Passenger and goods elevators are always tailor-made, customer-specific solutions that are precisely adapted to the technical requirements of the building they are in. Meiller delivers door panels in infinitely variable dimensions.

        Ultra-small batch sizes and countless variants

        Small to ultra-small batch sizes and an endless procession of different variants have to be dealt with. These factors call for production systems that can rise to the challenge of the requirements involved, without problems.

        KR C4 copes with the limitless variety

        While the operator on one side of the changing table is busy loading and clamping, the other side is already getting down to business: in the first step, both KR QUANTECs make a start on the welds that are required. Robot 1, mounted on a pedestal for maximum reach and equipped with a special welding gun, carries out the projection welding. As a result, the KR QUANTEC can connect the top and bottom of the outer shell with the outer rail simultaneously. Robot 2, also pedestal-mounted, simultaneously spot-welds the open U-rail to the underside of the door panel.
        This procedure takes less time than the projection welding, so while robot 1 is still welding, robot 2 quickly swaps over its welding gun for a vacuum gripper using an automatic tool change system from Stäubli Connectors, thereby mutating into a handling specialist. Once all the projection welds have been completed, robot 2 picks up the door panel and moves it to the stamping station where various rows of holes are punched into it. Following stamping, the robot moves the door panel to a press which lightly compresses the projecting sheets of metal in one corner, in order to rule out the potential of injury.
        The robot's job ends when the door panel is placed on a pallet, at which stage the panel is ready to install without requiring further reworking. In order to cope with the limitless variety in terms of production engineering, Meiller Aufzugtüren makes consistent use of machining programs with parameter settings. When the system starts, the operator merely selects the material – stainless steel, galvanized steel or hot-dip galvanized steel – as well as the length and width of the door panel. The situation with the robot controller is quite different. The KR C4 not only calculates the robot movements including monitoring for collisions, but also works out the parameters and position of every single spot weld, the number and position of the punching operations that are required as well as the position of the clamping fixtures.

        Two KUKA KR QUANTEC do the welding work at Meiller as a team.[No text in field]

        KUKA KR QUANTEC with power and reach

        Two KUKA QUANTEC robots of type KR 150 R 3300 prime K carry out all the requisite production stages: projection welding, spot welding, handling, stamping, forming and finally placing the ready-to install door panel. Handling such oversize door panels is no problem for the KR QUANTEC thanks to its carrying capacity of up to 150 kilograms with a reach of 3301 millimeters. The KUKA KR C4 robot controller impresses in this task with superior performance. The high-performance controller can take in its stride the enormous variety of programs and the resulting complexity of the control task. As a result, none of the parameters are stored in the PLC, but rather in the robot controller.

        Maximum flexibility and quality

        The new system not only achieves maximum flexibility, but is also able to set benchmarks with regard to the quality of production. The KR QUANTEC welding robots and the welding engineering that is used ensure perfect welds and a precisely defined energy input. The panels only become hand warm during welding. There is hardly any more thermal distortion, and deformation or rotational offset no longer occur.

        Find KUKA system partners in your area

        Find the right partner for your industry or specific challenge here.

        主站蜘蛛池模板: 中文字幕久久国产精品| 午夜免费福利| 真人无码作爱免费视频| 内射网址| 井冈山市| 亚洲综合五月| 亚洲精品漫画一二三区 | 久久精品熟妇丰满人妻99| 九九热免费在线观看视频| 92久久精品一区二区| 日日碰狠狠添天天爽超碰97久久 | 国产一区二区三级在线| 国产精品人成视频免费国产| 国产日韩精品视频无码| 国产乱子夫妻xx黑人xyx真爽| 精品少妇人妻久久精品| 精品国产av无码一区二区三区 | 欧美末成年videos丨| 五月综合婷婷开心综合婷婷| 亚洲综合av一区二区三区| 亚州无码熟女| 亚洲三级视频| 8AV国产精品爽爽ⅤA在线观看 | 日本久久乱| 91精品国产91久久久无码色戒| 中文字幕国产精品资源| 国产中文在线| 亚洲精品二| 国产精品女主播在线观看| 国产99在线 | 亚洲| 欧洲精品色在线观看| 国产蜜臀在线一区二区三区| 亚洲日本视频一区二区三区| 亚洲无av码一区二区三区| av亚洲一区二区在线| 五月丁香啪啪| 国产亚洲精品综合一区| 久久亚洲精品中文字幕二区| 日韩永久永久永久黄色大片| 人妻狠狠操| 国产精品成人亚洲|