        Location

        KUKA KR QUANTEC welds and assembles door panels at Meiller Aufzugtüren

        Highly flexible robot cell for producing elevator doors


        More than 80,000 door panels leave the plant of Meiller Aufzugtüren in Munich every year – and the trend is rising. What makes this statistic special is that hardly any door panel is identical to another. Passenger and goods elevators are always tailor-made, customer-specific solutions that are precisely adapted to the technical requirements of the building they are in. Meiller delivers door panels in infinitely variable dimensions.

        Ultra-small batch sizes and countless variants

        Small to ultra-small batch sizes and an endless procession of different variants have to be dealt with. These factors call for production systems that can rise to the challenge of the requirements involved, without problems.

        KR C4 copes with the limitless variety

        While the operator on one side of the changing table is busy loading and clamping, the other side is already getting down to business: in the first step, both KR QUANTECs make a start on the welds that are required. Robot 1, mounted on a pedestal for maximum reach and equipped with a special welding gun, carries out the projection welding. As a result, the KR QUANTEC can connect the top and bottom of the outer shell with the outer rail simultaneously. Robot 2, also pedestal-mounted, simultaneously spot-welds the open U-rail to the underside of the door panel.
        This procedure takes less time than the projection welding, so while robot 1 is still welding, robot 2 quickly swaps over its welding gun for a vacuum gripper using an automatic tool change system from Stäubli Connectors, thereby mutating into a handling specialist. Once all the projection welds have been completed, robot 2 picks up the door panel and moves it to the stamping station where various rows of holes are punched into it. Following stamping, the robot moves the door panel to a press which lightly compresses the projecting sheets of metal in one corner, in order to rule out the potential of injury.
        The robot's job ends when the door panel is placed on a pallet, at which stage the panel is ready to install without requiring further reworking. In order to cope with the limitless variety in terms of production engineering, Meiller Aufzugtüren makes consistent use of machining programs with parameter settings. When the system starts, the operator merely selects the material – stainless steel, galvanized steel or hot-dip galvanized steel – as well as the length and width of the door panel. The situation with the robot controller is quite different. The KR C4 not only calculates the robot movements including monitoring for collisions, but also works out the parameters and position of every single spot weld, the number and position of the punching operations that are required as well as the position of the clamping fixtures.

        Two KUKA KR QUANTEC do the welding work at Meiller as a team.[No text in field]

        KUKA KR QUANTEC with power and reach

        Two KUKA QUANTEC robots of type KR 150 R 3300 prime K carry out all the requisite production stages: projection welding, spot welding, handling, stamping, forming and finally placing the ready-to install door panel. Handling such oversize door panels is no problem for the KR QUANTEC thanks to its carrying capacity of up to 150 kilograms with a reach of 3301 millimeters. The KUKA KR C4 robot controller impresses in this task with superior performance. The high-performance controller can take in its stride the enormous variety of programs and the resulting complexity of the control task. As a result, none of the parameters are stored in the PLC, but rather in the robot controller.

        Maximum flexibility and quality

        The new system not only achieves maximum flexibility, but is also able to set benchmarks with regard to the quality of production. The KR QUANTEC welding robots and the welding engineering that is used ensure perfect welds and a precisely defined energy input. The panels only become hand warm during welding. There is hardly any more thermal distortion, and deformation or rotational offset no longer occur.

        Find KUKA system partners in your area

        Find the right partner for your industry or specific challenge here.

        主站蜘蛛池模板: 国产激情综合五月久久| 精品国产高清中文字幕| 日本韩国国产精品一区| 亚洲无人区一区二区三区| 久久久久无码| 成人3d动漫一区二区三区| 精品卡一卡二卡3卡高清乱码| 成人特黄特色毛片免费看| 久久羞羞色院精品全部免费| 91高清免费| 色屁屁WWW影院免费观看入口| 韩国无码AV片午夜福利| 熟妇啊轻点灬大ji巴太粗最新视频| 东京热无码国产精品| 2022免费国产精品福利在线| 电影在线观看+伦理片| 精品久久久久久久久久中文字幕| 肏屄视频在线播放| 一本久道久久综合狠狠爱| 精品国产AV一区二区三区| 蜜臀av午夜精品福利| 激情综合网激情国产av| 成人免费A片| 亚洲天堂影音先锋| 亚洲乱码一区二区三区视色| 蜜臀AVWWW国产天堂| 日韩欧洲在线高清一区| 日韩人妻无码精品久久| 一区天堂中文最新版在线| 久久天天躁夜夜躁狠狠I女人| 国产亚洲中文| 久久伊人精品只有这里有| 99国产精品白浆无码流出| 精品一区二区三区自拍图片区| 亚洲一精品一区二区三区| 国产永久免费高清在线观看| 久久亚洲色www成人欧美| ZZIJZZIJ亚洲日本少妇| 激情综合一区二区三区| 2019亚洲午夜无码天堂| 免费看无码网站成人A片|