<sub id="for6y"><s id="for6y"><form id="for6y"></form></s></sub>

    <cite id="for6y"></cite>

        <s id="for6y"></s>
        亚洲一品道一区二区三区,国产无套粉嫩白浆在线,51妺嘿嘿午夜福利,人人妻人人澡人人爽人人精品av,欧美一区二区三区欧美日韩亚洲,欧美一本大道香蕉综合视频 ,884aa四虎影成人精品,国产精品久久久久久福利69堂

        Select your location:

        Location

        KUKA KR QUANTEC welds and assembles door panels at Meiller Aufzugtüren

        Highly flexible robot cell for producing elevator doors


        More than 80,000 door panels leave the plant of Meiller Aufzugtüren in Munich every year – and the trend is rising. What makes this statistic special is that hardly any door panel is identical to another. Passenger and goods elevators are always tailor-made, customer-specific solutions that are precisely adapted to the technical requirements of the building they are in. Meiller delivers door panels in infinitely variable dimensions.

        Ultra-small batch sizes and countless variants

        Small to ultra-small batch sizes and an endless procession of different variants have to be dealt with. These factors call for production systems that can rise to the challenge of the requirements involved, without problems.

        KR C4 copes with the limitless variety

        While the operator on one side of the changing table is busy loading and clamping, the other side is already getting down to business: in the first step, both KR QUANTECs make a start on the welds that are required. Robot 1, mounted on a pedestal for maximum reach and equipped with a special welding gun, carries out the projection welding. As a result, the KR QUANTEC can connect the top and bottom of the outer shell with the outer rail simultaneously. Robot 2, also pedestal-mounted, simultaneously spot-welds the open U-rail to the underside of the door panel.
        This procedure takes less time than the projection welding, so while robot 1 is still welding, robot 2 quickly swaps over its welding gun for a vacuum gripper using an automatic tool change system from Stäubli Connectors, thereby mutating into a handling specialist. Once all the projection welds have been completed, robot 2 picks up the door panel and moves it to the stamping station where various rows of holes are punched into it. Following stamping, the robot moves the door panel to a press which lightly compresses the projecting sheets of metal in one corner, in order to rule out the potential of injury.
        The robot's job ends when the door panel is placed on a pallet, at which stage the panel is ready to install without requiring further reworking. In order to cope with the limitless variety in terms of production engineering, Meiller Aufzugtüren makes consistent use of machining programs with parameter settings. When the system starts, the operator merely selects the material – stainless steel, galvanized steel or hot-dip galvanized steel – as well as the length and width of the door panel. The situation with the robot controller is quite different. The KR C4 not only calculates the robot movements including monitoring for collisions, but also works out the parameters and position of every single spot weld, the number and position of the punching operations that are required as well as the position of the clamping fixtures.

        Two KUKA KR QUANTEC do the welding work at Meiller as a team.[No text in field]

        KUKA KR QUANTEC with power and reach

        Two KUKA QUANTEC robots of type KR 150 R 3300 prime K carry out all the requisite production stages: projection welding, spot welding, handling, stamping, forming and finally placing the ready-to install door panel. Handling such oversize door panels is no problem for the KR QUANTEC thanks to its carrying capacity of up to 150 kilograms with a reach of 3301 millimeters. The KUKA KR C4 robot controller impresses in this task with superior performance. The high-performance controller can take in its stride the enormous variety of programs and the resulting complexity of the control task. As a result, none of the parameters are stored in the PLC, but rather in the robot controller.

        Maximum flexibility and quality

        The new system not only achieves maximum flexibility, but is also able to set benchmarks with regard to the quality of production. The KR QUANTEC welding robots and the welding engineering that is used ensure perfect welds and a precisely defined energy input. The panels only become hand warm during welding. There is hardly any more thermal distortion, and deformation or rotational offset no longer occur.

        Find KUKA system partners in your area

        Find the right partner for your industry or specific challenge here.

        主站蜘蛛池模板: 亚洲线精品一区二区三区影音先锋| 91人妻中文字幕在线精品| 7777欧美成是人在线观看| 熟女丝袜av| 韩国精品福利视频一区二区| 午夜精品久久久久久久爽| 特级做AA爰片毛片免费看| 国产人成无码视频在线观看| 色色97| 人妻少妇精品无码专区| 一区二区AV| 人妻无码熟妇乱又伦精品视频| 欧美A级理论片在线播放| AV无码一区二区三区国产| 国产性在线| 亚洲一区二区精品偷拍| 国产精品二区中文字幕| 日韩精品一区二区av在线观看| 日本女V片| 中文字幕成人| 日本一卡二卡四卡无卡国产| 尤物视频色版在线观看| 亚洲欧美自偷自拍视频图片| 伊人免费在线| 欲香欲色天天综合和网| 中文字幕天天躁日日躁狠狠躁| 成人免费无遮挡无码黄漫视频| 欧美顶级裸体met自慰| 国产精品av中文字幕| 亚洲超碰97无码中文字幕| av无码免费在线观看| 亚洲成av人片天堂网无码| 国产麻豆成人传媒免费观看| 无码国产精品一区二区免费虚拟VR | 高清精品一区二区三区| 久热这里只精品视频99| 亚洲男人第一无码av网站| 国产一区二区三区色成人| 亚州无码成人| 日韩人妻无码中文字幕视频| 蜜桃av无码免费看永久|