        KUKA KR QUANTEC welds and assembles door panels at Meiller Aufzugtüren

        Highly flexible robot cell for producing elevator doors


        More than 80,000 door panels leave the plant of Meiller Aufzugtüren in Munich every year – and the trend is rising. What makes this statistic special is that hardly any door panel is identical to another. Passenger and goods elevators are always tailor-made, customer-specific solutions that are precisely adapted to the technical requirements of the building they are in. Meiller delivers door panels in infinitely variable dimensions.

        Ultra-small batch sizes and countless variants

        Small to ultra-small batch sizes and an endless procession of different variants have to be dealt with. These factors call for production systems that can rise to the challenge of the requirements involved, without problems.

        KR C4 copes with the limitless variety

        While the operator on one side of the changing table is busy loading and clamping, the other side is already getting down to business: in the first step, both KR QUANTECs make a start on the welds that are required. Robot 1, mounted on a pedestal for maximum reach and equipped with a special welding gun, carries out the projection welding. As a result, the KR QUANTEC can connect the top and bottom of the outer shell with the outer rail simultaneously. Robot 2, also pedestal-mounted, simultaneously spot-welds the open U-rail to the underside of the door panel.
        This procedure takes less time than the projection welding, so while robot 1 is still welding, robot 2 quickly swaps over its welding gun for a vacuum gripper using an automatic tool change system from Stäubli Connectors, thereby mutating into a handling specialist. Once all the projection welds have been completed, robot 2 picks up the door panel and moves it to the stamping station where various rows of holes are punched into it. Following stamping, the robot moves the door panel to a press which lightly compresses the projecting sheets of metal in one corner, in order to rule out the potential of injury.
        The robot's job ends when the door panel is placed on a pallet, at which stage the panel is ready to install without requiring further reworking. In order to cope with the limitless variety in terms of production engineering, Meiller Aufzugtüren makes consistent use of machining programs with parameter settings. When the system starts, the operator merely selects the material – stainless steel, galvanized steel or hot-dip galvanized steel – as well as the length and width of the door panel. The situation with the robot controller is quite different. The KR C4 not only calculates the robot movements including monitoring for collisions, but also works out the parameters and position of every single spot weld, the number and position of the punching operations that are required as well as the position of the clamping fixtures.

        Two KUKA KR QUANTEC do the welding work at Meiller as a team.[No text in field]

        KUKA KR QUANTEC with power and reach

        Two KUKA QUANTEC robots of type KR 150 R 3300 prime K carry out all the requisite production stages: projection welding, spot welding, handling, stamping, forming and finally placing the ready-to install door panel. Handling such oversize door panels is no problem for the KR QUANTEC thanks to its carrying capacity of up to 150 kilograms with a reach of 3301 millimeters. The KUKA KR C4 robot controller impresses in this task with superior performance. The high-performance controller can take in its stride the enormous variety of programs and the resulting complexity of the control task. As a result, none of the parameters are stored in the PLC, but rather in the robot controller.

        Maximum flexibility and quality

        The new system not only achieves maximum flexibility, but is also able to set benchmarks with regard to the quality of production. The KR QUANTEC welding robots and the welding engineering that is used ensure perfect welds and a precisely defined energy input. The panels only become hand warm during welding. There is hardly any more thermal distortion, and deformation or rotational offset no longer occur.

        Find KUKA system partners in your area

        Find the right partner for your industry or specific challenge here.

        主站蜘蛛池模板: 日韩永久永久永久黄色大片| 香蕉人人超人人超碰超国产| 国产精品碰碰现在自在拍| 亚洲日本一本dvd高清| 无码免费大香伊蕉在人线国产 | AV不卡在线| 日韩视频中文字幕专区| 五月婷婷色综合| 久久本道综合久久伊人| 在线精品另类自拍视频| 极品尤物被啪到呻吟喷水| 色噜噜人妻丝袜AⅤ资源| 日本精品一在线观看视频| 国产成人精品蜜芽视频| 成人亚洲国产精品一区不卡 | 亚洲经典自拍AV| 午夜在线不卡| 久久精品毛片av一区二区三区 | 亚洲xxxxxx| 亚洲午夜成aⅴ人片| 久热爱精品视频在线观看久爱| 中文字幕熟妇人妻在线视频| 国产日韩欧美| 日本一区二区三区激情视频| 国产中文字幕精品视频| 亚洲AV无码之国产精品网址蜜芽| 亚洲偷偷色| 天天躁夜夜躁狠狠躁躁88| 国产一区二区三区在线观看视频| 日韩欧美卡一卡二卡新区 | 特黄特色的大片观看免费视频| 2018久久| 亚洲 无码 制服 丝袜 自拍| 久久久噜噜噜久久综合| 国产成人无码精品一区二区三区 | 人伦中文字幕| 九九热这里都是精品| 污网站在线| 亚洲色偷偷色噜噜狠狠99| 国产亚洲欧洲av综合一区二区三区| www.黄色|