        KUKA KR QUANTEC welds and assembles door panels at Meiller Aufzugtüren

        Highly flexible robot cell for producing elevator doors


        More than 80,000 door panels leave the plant of Meiller Aufzugtüren in Munich every year – and the trend is rising. What makes this statistic special is that hardly any door panel is identical to another. Passenger and goods elevators are always tailor-made, customer-specific solutions that are precisely adapted to the technical requirements of the building they are in. Meiller delivers door panels in infinitely variable dimensions.

        Ultra-small batch sizes and countless variants

        Small to ultra-small batch sizes and an endless procession of different variants have to be dealt with. These factors call for production systems that can rise to the challenge of the requirements involved, without problems.

        KR C4 copes with the limitless variety

        While the operator on one side of the changing table is busy loading and clamping, the other side is already getting down to business: in the first step, both KR QUANTECs make a start on the welds that are required. Robot 1, mounted on a pedestal for maximum reach and equipped with a special welding gun, carries out the projection welding. As a result, the KR QUANTEC can connect the top and bottom of the outer shell with the outer rail simultaneously. Robot 2, also pedestal-mounted, simultaneously spot-welds the open U-rail to the underside of the door panel.
        This procedure takes less time than the projection welding, so while robot 1 is still welding, robot 2 quickly swaps over its welding gun for a vacuum gripper using an automatic tool change system from Stäubli Connectors, thereby mutating into a handling specialist. Once all the projection welds have been completed, robot 2 picks up the door panel and moves it to the stamping station where various rows of holes are punched into it. Following stamping, the robot moves the door panel to a press which lightly compresses the projecting sheets of metal in one corner, in order to rule out the potential of injury.
        The robot's job ends when the door panel is placed on a pallet, at which stage the panel is ready to install without requiring further reworking. In order to cope with the limitless variety in terms of production engineering, Meiller Aufzugtüren makes consistent use of machining programs with parameter settings. When the system starts, the operator merely selects the material – stainless steel, galvanized steel or hot-dip galvanized steel – as well as the length and width of the door panel. The situation with the robot controller is quite different. The KR C4 not only calculates the robot movements including monitoring for collisions, but also works out the parameters and position of every single spot weld, the number and position of the punching operations that are required as well as the position of the clamping fixtures.

        Two KUKA KR QUANTEC do the welding work at Meiller as a team.[No text in field]

        KUKA KR QUANTEC with power and reach

        Two KUKA QUANTEC robots of type KR 150 R 3300 prime K carry out all the requisite production stages: projection welding, spot welding, handling, stamping, forming and finally placing the ready-to install door panel. Handling such oversize door panels is no problem for the KR QUANTEC thanks to its carrying capacity of up to 150 kilograms with a reach of 3301 millimeters. The KUKA KR C4 robot controller impresses in this task with superior performance. The high-performance controller can take in its stride the enormous variety of programs and the resulting complexity of the control task. As a result, none of the parameters are stored in the PLC, but rather in the robot controller.

        Maximum flexibility and quality

        The new system not only achieves maximum flexibility, but is also able to set benchmarks with regard to the quality of production. The KR QUANTEC welding robots and the welding engineering that is used ensure perfect welds and a precisely defined energy input. The panels only become hand warm during welding. There is hardly any more thermal distortion, and deformation or rotational offset no longer occur.

        Find KUKA system partners in your area

        Find the right partner for your industry or specific challenge here.

        主站蜘蛛池模板: 亚洲AV永久中文无码精品综合| 亚洲中文人妻制服| 2020国产精品永久在线观看| 中文字幕在线天堂| 欧美乱码伦视频免费| 高清自拍亚洲精品二区| 日日碰狠狠添天天爽| 亚洲AV无码不卡在线播放| 国产尤物免费av免费| 免费人成自慰网站| 美欧日韩一区二区三区视频| 精品国产大片中文字幕| 国产精品国三级国产av| 无码人妻精品一区二区中文 | 69堂在线观看线无码视频一| 天堂在线中文| 欧美专区第二页| 精品中文字幕有码视频| 在线a亚洲老鸭窝天堂| 高清不卡一区二区三区| 亚洲精品综合久中文字幕| 96无码| 人人肏人人| 日韩无码第2页| 伊人精品无码AV一区二区三区| 欧美性爱精品一区二区三区| 日本熟妇XXXX潮喷视频| 又黄又刺激又黄又舒服| 国产精品福利在线观看无码卡一| 国产精品久久久久久人妻红杏1| 激情宗合网| 在线看片免费不卡人成视频| 国产精品夜夜春夜夜爽久久小| 激情久久综合精品久久人妻| 亚洲av成人免费在线| 无码AV动漫精品一区二区免费| 亚洲一人综合| 精品午夜中文字幕熟女人妻在线| 丰满的熟妇岳中文字幕| 北条麻妃一区二区三区av高清| 亚洲一区二区三区水蜜桃|